Scope of Works – 1950s Bungalow Second Story Renovation
The renovation project faced a number of challenges. One difficulty was keeping the house weatherproof while the roof was being worked on. Additionally, there were shortages in the supply of Gib and changing inspection timelines meaning longer lead times and only two inspections could be booked at a time.
These challenges had a ripple effect on other jobs, which made it more difficult to keep the work progressing as scheduled. To keep things on track Michael rolled up his sleeves and pitch in to help the lads.